+902164698777
info@protekproje.com

BUCA

LINK HIGHWAY BETWEEN BUCA-ONAT AND INTERCITY BUS TERMINAL AND RING ROAD IN IZMIR DETAILED DESIGN WORKS

Description of actual services provided in the assignment:

  • 7.015 km (2×3 lanes) Highway
  • 3.45 km (2×1, 2×2 Lanes) Link Road
  • 3 pieces At-grade Intersection
  • 5 pieces Interchanges
  • 1 pieces Tunnel Twin Tube; L1=2543 m., L2=2508 m.
  • 2 pieces Viaduct (20614 m²; L1=814,35m., L2=365.65 m.)
  • 3 pieces Bridge (1360 m²)
  • 1 pieces Post Tension Bridge(1798 m²),
  • 4 pieces Underpasses (2397 m²),
  • Retaining Walls (27000 m²)
  • 8 pieces (2×2, 3×2, 4×3) box culvert
previous arrow
next arrow
Shadow
Slider