Skip to content
• LINK HIGHWAY BETWEEN BUCA-ONAT AND INTERCITY BUS TERMINAL AND RING ROAD IN IZMIR DETAILED DESIGN WORKS
Description of actual services provided in the assignment:
- 7.015 km (2×3 lanes) Highway
- 3.45 km (2×1, 2×2 Lanes) Link Road
- 3 pieces At-grade Intersection
- 5 pieces Interchanges
- 1 pieces Tunnel Twin Tube; L1=2543 m., L2=2508 m.
- 2 pieces Viaduct (20614 m²; L1=814,35m., L2=365.65 m.)
- 3 pieces Bridge (1360 m²)
- 1 pieces Post Tension Bridge(1798 m²),
- 4 pieces Underpasses (2397 m²),
- Retaining Walls (27000 m²)
- 8 pieces (2×2, 3×2, 4×3) box culvert